“This is to confirm that Thinc Projects were the project Managers of Rio Tinto’s development of ergonomic sit-stand workstations for the Remote Operations Facility in Perth in 2011. AME System was the successful workstation design and installation vendor engaged via a competitive tender process.
In our opinion AME’s design for Rio Tinto was innovative, flexible and suitable to the client’s varying needs. This system was subsequently prototyped & delivered professionally, safely, on time to a high quality
We would have no hesitation tendering future projects to AME System again should the opportunity arise.”
“In our airport control tower automation project we had a need to design and deliver an innovative new console product to meet evolving and expanding industry needs for the next couple of decades. Not only for the demanding needs of Air Traffic Control (ATC) users but also to accommodate the ever changing technical systems required to service that market.
AME System won the contract against strong international competition to transform a user requirements specification into a professionally designed and manufactured product that is equal with the best the world has to offer at an affordable price. Their design permits the systems to evolve with changing needs over time and meets ATC needs for high quality console furniture without compromise.”
“I found working with your AME System to be very professional, responsive and adapted to dealing with the changing customer requirements. Your team arrived onsite with the correct paperwork worked within difficult space limited circumstances without any issues or complaint, and delivered a very good outcome for the Origin internal client.
Would be a pleasure to work with your team again.”</P
“Our confidence in AME Systems consistently meeting our expectations is so much so, that we have used their products in 3 casinos and would definitely be looking to AME System for any future new projects.
Our operations team is absolutely ecstatic with the ergonomics of our consoles and they consistently utilize the height adjustment in order to control & customize their individual working environment.”
“AME System’s shop detailing and fabrication phases produced an excellent product which every stakeholder and user has commented upon favourably.
We presented AME with quite specific design criteria and time commitments as conditions precedent to their contract award. AME took them all on professionally and we were never to experience a problem or complaint.
Very importantly, on the tight site and in the tight timeline, the work site was shared with the building works fitout contractor (who was not AME’s head contractor) and they were well impressed with how AME personnel did their work, especially their cooperation in staggering the amount of material they brought up to the site at a time so as to reduce congestion and to maintain safety in the crowded site.
AME worked cooperatively, professionally and efficiently amongst all the other activity and overhead works going on.
The fitout contractor reported they were not distracted by AME’s activities as they fitted in professionally with all the other activity on site.
AME completed their work in 2½ days having been allotted 5 days.”